Skip to workflow content
Vora
← Workflow library

Client Delivery

Change Order Impact — Asana task draft

Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order. Prepare an Asana task draft.

Experimental native example · local preview · revision 1

WORKFLOW PREVIEW

See how it works

3 nodes · 2 connections

Use + and − to zoom, F to fit. Press Enter on a node to inspect it.

Private preview. These tested drafts are available for inspection. Adding them to a Vora workspace is still being tested.

What you need

  • Authorized supplied job facts matching the original closed input contract.
  • Explicit review metadata and target destination fields; no implicit team, channel, list or project selection.
Follow the workflow step by step
  1. Supplied agency job and review metadata

    Receive the explicitly supplied manual input packet.

  2. Change Order Impact

    Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order.

  3. Asana task draft

    Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order.

Setup and review

  • Download the workflow JSON and inspect its jobInput and deliveryMetadata contracts.
  • Supply the original agency job input plus explicit review metadata and destination.
  • Run in an isolated test and inspect the complete jobResult, target status, holds and escape report before taking an external action.

Inspect every node

Expand a node to inspect its complete settings. Review the runtime and adoption evidence before installing it.

Supplied agency job and review metadata · wfManualTrigger
{
  "label": "Supplied agency job and review metadata"
}
Change Order Impact · code
{
  "label": "Change Order Impact",
  "code": "return (function(context){\nconst slug=\"change-order-impact\";\n\nfunction fail(reason){throw new Error('Invalid '+slug+' input: '+reason);}\nfunction safe(value){if(!Number.isSafeInteger(value))fail('unsafe integer arithmetic');return value;}\nfunction nonneg(value,name='quantity'){if(!Number.isSafeInteger(value)||value<0)fail(name+' must be nonnegative');return value;}\nfunction positive(value,name='quantity'){nonneg(value,name);if(value===0)fail(name+' must be positive');return value;}\nfunction ident(value){if(typeof value!=='string'||!value.trim())fail('blank identity');return value.trim();}\nfunction unique(values,key){const seen=new Set();for(const value of values){const k=ident(key?value[key]:value);if(seen.has(k))fail('duplicate identity');seen.add(k);}return values;}\nfunction rows(values,key='id'){return unique(values,key);}\nfunction sum(values){return values.reduce((total,value)=>safe(total+value),0);}\nfunction mul(a,b){return safe(a*b);}\nfunction sorted(values){return [...values].sort((a,b)=>a<b?-1:a>b?1:0);}\nfunction distinct(values){return [...new Set(values)];}\nfunction pair(a,b){return JSON.stringify([a,b]);}\nfunction day(value){if(typeof value!=='string'||!/^\\d{4}-\\d{2}-\\d{2}$/.test(value))fail('invalid calendar date');const n=Date.parse(value+'T00:00:00Z');if(!Number.isFinite(n)||new Date(n).toISOString().slice(0,10)!==value)fail('invalid calendar date');return n/86400000;}\nfunction dayText(value){const date=new Date(mul(value,86400000));if(!Number.isFinite(date.getTime())||date.getUTCFullYear()<0||date.getUTCFullYear()>9999)fail('four-digit calendar range');return date.toISOString().slice(0,10);}\nfunction stamp(value){const match=typeof value==='string'&&value.match(/^(\\d{4}-\\d{2}-\\d{2})T(\\d{2}):(\\d{2}):(\\d{2})(Z|[+-]\\d{2}:\\d{2})$/);if(!match)fail('invalid offset timestamp');day(match[1]);if(+match[2]>23||+match[3]>59||+match[4]>59)fail('invalid clock time');if(match[5]!=='Z'&&(+match[5].slice(1,3)>23||+match[5].slice(4)>59))fail('invalid offset');const n=Date.parse(value);if(!Number.isFinite(n))fail('invalid timestamp');return n/1000;}\nfunction stampText(value){const date=new Date(mul(value,1000));if(!Number.isFinite(date.getTime())||date.getUTCFullYear()<0||date.getUTCFullYear()>9999)fail('four-digit calendar range');return date.toISOString();}\nfunction interval(start,end){if(end<=start)fail('reversed or empty interval');}\nfunction normalize(value,key=''){if(typeof value==='string'&&(key==='id'||key.endsWith('Id')||key.endsWith('Ids')||['members','clients','partners','pageIds','expectedIds','jobs','requiredAttendees','requires','dependsOn'].includes(key)))return value.trim();if(Array.isArray(value))return value.map(v=>normalize(v,key));if(value&&typeof value==='object')return Object.fromEntries(Object.entries(value).map(([k,v])=>[k,normalize(v,k)]));return value;}\nfunction graphCheck(nodes,edges){const byId=new Map(rows(nodes).map(n=>[n.id,n]));const visiting=new Set(),done=new Set();function visit(id){if(visiting.has(id))fail('dependency cycle');if(done.has(id))return;const node=byId.get(id);if(!node)fail('unknown dependency reference');visiting.add(id);unique(edges(node));for(const target of edges(node)){if(target===id)fail('self prerequisite');visit(target);}visiting.delete(id);done.add(id);}for(const id of byId.keys())visit(id);return byId;}\nfunction monthNumber(date){day(date);return Number(date.slice(0,4))*12+Number(date.slice(5,7))-1;}\nfunction sweep(items,startKey,endKey,limit){const points=sorted(distinct(items.flatMap(item=>[item[startKey],item[endKey]]))).sort((a,b)=>a-b),out=[];for(let i=0;i+1<points.length;i++){const start=points[i],end=points[i+1],active=sorted(items.filter(item=>item[startKey]<=start&&item[endKey]>start).map(item=>item.id));if(active.length>limit){const last=out.at(-1);if(last&&last.end===start&&JSON.stringify(last.active)===JSON.stringify(active))last.end=end;else out.push({start,end,active});}}return out;}\nfunction httpUrl(value){if(typeof value!=='string'||/[\\u0000-\\u0020\\u007f<>\"\\\\]/.test(value)||/%(?![0-9a-f]{2})/i.test(value))return null;const m=value.match(/^https?:\\/\\/([^/?#]+)([^#]*)(?:#.*)?$/i);if(!m||m[1].includes('@'))return null;const authority=m[1].match(/^([^:]+)(?::(\\d{1,5}))?$/);if(!authority||(authority[2]&&Number(authority[2])>65535))return null;const host=authority[1],labels=host.split('.');if(host.length>253||labels.some(l=>!l||l.length>63||!/^[a-z0-9](?:[a-z0-9-]*[a-z0-9])?$/i.test(l)))return null;if(labels.every(l=>/^\\d+$/.test(l))&&(labels.length!==4||labels.some(l=>Number(l)>255||(l.length>1&&l[0]==='0'))))return null;const q=m[2].indexOf('?'),raw=q<0?'':m[2].slice(q+1),query=[];try{if(raw)for(const part of raw.split('&')){const at=part.indexOf('='),key=at<0?part:part.slice(0,at),val=at<0?'':part.slice(at+1);query.push([decodeURIComponent(key.replace(/\\+/g,' ')),decodeURIComponent(val.replace(/\\+/g,' '))]);}}catch{return null;}return {query};}\n\nconst input=normalize(context.input);\nreturn (input=>{\n rows(input.items);let netMinutes=0,netFeeMinor=0;const unestimatedIds=[];for(const item of input.items){nonneg(item.minutes,'effort');nonneg(item.ratePerHourMinor,'rate');if(!item.estimated){unestimatedIds.push(item.id);continue;}const fee=safe(Math.ceil(mul(item.minutes,item.ratePerHourMinor)/60)),sign=item.removed?-1:1;netMinutes=safe(netMinutes+sign*item.minutes);netFeeMinor=safe(netFeeMinor+sign*fee);}return {netMinutes,netFeeMinor,unestimatedIds};\n})(input);\n})({input:context.input.jobInput});\n",
  "outputVar": "jobResult",
  "timeout": 3000,
  "memoryLimit": 64
}
Asana task draft · code
{
  "label": "Asana task draft",
  "code": "const jobResult=context.jobResult;\nconst delivery=(function(context){\nreturn ((function(originalResult,metadata,destination){\nfunction stableResult(value,depth=0){\n  if(depth>64)throw new Error('Result nesting exceeds 64');\n  if(value===null||typeof value==='string'||typeof value==='boolean')return JSON.stringify(value);\n  if(typeof value==='number'&&Number.isFinite(value))return JSON.stringify(value);\n  if(Array.isArray(value)){\n    if(Object.keys(value).length!==value.length||Array.from({length:value.length},(_,i)=>i).some(i=>!Object.hasOwn(value,i)))throw new Error('Result contains sparse data');\n    return '['+value.map(item=>stableResult(item,depth+1)).join(',')+']';\n  }\n  if(value&&typeof value==='object')return '{'+Object.keys(value).sort().map(key=>JSON.stringify(key)+':'+stableResult(value[key],depth+1)).join(',')+'}';\n  throw new Error('Result is not JSON data');\n}\nfunction utf8Length(text){\n  let bytes=0;\n  for(let i=0;i<text.length;i++){\n    const code=text.charCodeAt(i);\n    if(code<128)bytes++;else if(code<2048)bytes+=2;\n    else if(code>=55296&&code<=56319&&i+1<text.length&&text.charCodeAt(i+1)>=56320&&text.charCodeAt(i+1)<=57343){bytes+=4;i++;}\n    else bytes+=3;\n  }\n  return bytes;\n}\nfunction chunkText(text,maximum){\n  const chunks=[];\n  for(let start=0;start<text.length;){let end=Math.min(start+maximum,text.length);const last=text.charCodeAt(end-1),next=text.charCodeAt(end);if(end<text.length&&last>=55296&&last<=56319&&next>=56320&&next<=57343)end--;chunks.push(text.slice(start,end));start=end;}\n  return chunks;\n}\nfunction deliveryState(rendererId,originalResult,metadata,destination,destinationKeys){\n  const output={rendererId,status:'HELD',originalResult,drafts:[],holds:[],escapeReport:[]};\n  const hold=(code,message)=>{output.holds.push({code,message});return {output,json:''};};\n  const object=value=>value&&typeof value==='object'&&!Array.isArray(value);\n  const exact=(value,keys)=>object(value)&&Object.keys(value).length===keys.length&&keys.every(key=>Object.hasOwn(value,key));\n  const keys=['workflowId','canonicalIntentId','title','reviewUrl'],maxima=[128,200,200,1000];\n  if(!exact(metadata,keys)||keys.some((key,i)=>typeof metadata[key]!=='string'||!metadata[key].length||metadata[key].length>maxima[i]||/[\\u0000-\\u001f\\u007f]/.test(metadata[key]))||!/^https?:\\/\\/[^\\s<>\"']+$/.test(metadata.reviewUrl))return hold('INVALID_METADATA','Metadata must provide bounded workflowId, canonicalIntentId, title and an HTTP(S) reviewUrl.');\n  if(!exact(destination,destinationKeys)||destinationKeys.some(key=>typeof destination[key]!=='string'||!destination[key].length||destination[key].length>200||destination[key]!==destination[key].trim()||/[\\u0000-\\u001f\\u007f]/.test(destination[key])))return hold('INVALID_DESTINATION','Destination fields must be exactly: '+destinationKeys.join(', ')+'.');\n  let json;\n  try{if(!object(originalResult))throw new Error('Primary result must be a JSON object');json=stableResult(originalResult);}catch(error){return hold('INVALID_RESULT',error.message);}\n  if(json.length>32768||utf8Length(json)>65536)return hold('RESULT_BOUND_EXCEEDED','Original result exceeds this renderer profile; full original result is retained.');\n  return {output,json};\n}\nfunction escapeHtml(text){return text.replace(/&/g,'&amp;').replace(/</g,'&lt;').replace(/>/g,'&gt;').replace(/\"/g,'&quot;').replace(/'/g,'&#39;');}\nfunction escapeMarkdown(text){return text.replace(/&/g,'&amp;').replace(/[\\\\`*{}\\[\\]()#+\\-.!_|>~<]/g,'\\\\$&');}\nfunction markdownReviewText(metadata,json){\n  const runs=json.match(/`+/g)||[],fence='`'.repeat(Math.max(3,...runs.map(run=>run.length+1)));\n  return '# '+escapeMarkdown(metadata.title)+'\\n\\nWorkflow: '+escapeMarkdown(metadata.workflowId)+'\\nCanonical job: '+escapeMarkdown(metadata.canonicalIntentId)+'\\nReview: <'+metadata.reviewUrl.replace(/&/g,'&amp;')+'>\\n\\n'+fence+'json\\n'+json+'\\n'+fence+'\\n';\n}\nfunction plainReviewText(metadata,json){return metadata.title+'\\nWorkflow: '+metadata.workflowId+'\\nCanonical job: '+metadata.canonicalIntentId+'\\nReview: '+metadata.reviewUrl+'\\n\\n'+json;}\nfunction finishDraft(state,draft,texts=[],textMaximum=32768,byteMaximum=131072){\n  if(texts.some(text=>text.length>textMaximum)||utf8Length(JSON.stringify(draft))>byteMaximum){state.output.holds.push({code:'TARGET_BOUND_EXCEEDED',message:'Draft exceeds the target or Vora profile bound; no draft is emitted and the full original result is retained.'});return state.output;}\n  state.output.status='PREPARED';state.output.drafts=[draft];return state.output;\n}\nreturn (function asanaTaskReview(originalResult,metadata,destination){\n  const state=deliveryState('asana-task-review',originalResult,metadata,destination,['workspaceId']);if(state.output.holds.length)return state.output;\n  const notes=plainReviewText(metadata,state.json);return finishDraft(state,{body:{data:{workspace:destination.workspaceId,name:metadata.title,notes}}},[notes]);\n})(originalResult,metadata,destination);\n}))(context.input.jobResult,context.input.deliveryMetadata.metadata,context.input.deliveryMetadata.destination);\n\n})({input:{jobResult,deliveryMetadata:context.input.deliveryMetadata}});\nreturn {jobResult,delivery};\n",
  "outputVar": "result",
  "timeout": 3000,
  "memoryLimit": 64
}
Input and output contracts

Input

{
  "type": "object",
  "properties": {
    "jobInput": {
      "type": "object",
      "properties": {
        "items": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "id": {
                "type": "string",
                "maxLength": 2000
              },
              "removed": {
                "type": "boolean"
              },
              "minutes": {
                "type": "integer",
                "minimum": -9007199254740991,
                "maximum": 9007199254740991
              },
              "ratePerHourMinor": {
                "type": "integer",
                "minimum": -9007199254740991,
                "maximum": 9007199254740991
              },
              "estimated": {
                "type": "boolean"
              }
            },
            "required": [
              "id",
              "removed",
              "minutes",
              "ratePerHourMinor",
              "estimated"
            ],
            "additionalProperties": false
          },
          "maxItems": 100
        }
      },
      "required": [
        "items"
      ],
      "additionalProperties": false
    },
    "deliveryMetadata": {
      "type": "object",
      "properties": {
        "metadata": {
          "type": "object",
          "properties": {
            "workflowId": {
              "type": "string",
              "maxLength": 128
            },
            "canonicalIntentId": {
              "type": "string",
              "maxLength": 200
            },
            "title": {
              "type": "string",
              "maxLength": 200
            },
            "reviewUrl": {
              "type": "string",
              "maxLength": 1000
            }
          },
          "required": [
            "workflowId",
            "canonicalIntentId",
            "title",
            "reviewUrl"
          ],
          "additionalProperties": false
        },
        "destination": {
          "type": "object",
          "properties": {
            "workspaceId": {
              "type": "string",
              "maxLength": 200
            }
          },
          "required": [
            "workspaceId"
          ],
          "additionalProperties": false
        }
      },
      "required": [
        "metadata",
        "destination"
      ],
      "additionalProperties": false
    }
  },
  "required": [
    "jobInput",
    "deliveryMetadata"
  ],
  "additionalProperties": false
}

Output

{
  "type": "object",
  "properties": {
    "jobResult": {
      "type": "object",
      "properties": {
        "netMinutes": {
          "type": "integer",
          "minimum": -9007199254740991,
          "maximum": 9007199254740991
        },
        "netFeeMinor": {
          "type": "integer",
          "minimum": -9007199254740991,
          "maximum": 9007199254740991
        },
        "unestimatedIds": {
          "type": "array",
          "items": {
            "type": "string",
            "maxLength": 2000
          },
          "maxItems": 1000
        }
      },
      "required": [
        "netMinutes",
        "netFeeMinor",
        "unestimatedIds"
      ],
      "additionalProperties": false
    },
    "delivery": {
      "type": "object",
      "properties": {
        "rendererId": {
          "type": "string",
          "maxLength": 128,
          "enum": [
            "asana-task-review"
          ]
        },
        "status": {
          "type": "string",
          "maxLength": 16,
          "enum": [
            "PREPARED",
            "HELD"
          ]
        },
        "originalResult": {
          "type": "object",
          "properties": {
            "netMinutes": {
              "type": "integer",
              "minimum": -9007199254740991,
              "maximum": 9007199254740991
            },
            "netFeeMinor": {
              "type": "integer",
              "minimum": -9007199254740991,
              "maximum": 9007199254740991
            },
            "unestimatedIds": {
              "type": "array",
              "items": {
                "type": "string",
                "maxLength": 2000
              },
              "maxItems": 1000
            }
          },
          "required": [
            "netMinutes",
            "netFeeMinor",
            "unestimatedIds"
          ],
          "additionalProperties": false
        },
        "drafts": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "body": {
                "type": "object",
                "properties": {
                  "data": {
                    "type": "object",
                    "properties": {
                      "workspace": {
                        "type": "string",
                        "maxLength": 200
                      },
                      "name": {
                        "type": "string",
                        "maxLength": 200
                      },
                      "notes": {
                        "type": "string",
                        "maxLength": 32768
                      }
                    },
                    "required": [
                      "workspace",
                      "name",
                      "notes"
                    ],
                    "additionalProperties": false
                  }
                },
                "required": [
                  "data"
                ],
                "additionalProperties": false
              }
            },
            "required": [
              "body"
            ],
            "additionalProperties": false
          },
          "maxItems": 1,
          "minItems": 0
        },
        "holds": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "code": {
                "type": "string",
                "maxLength": 128
              },
              "message": {
                "type": "string",
                "maxLength": 2000
              }
            },
            "required": [
              "code",
              "message"
            ],
            "additionalProperties": false
          },
          "maxItems": 10,
          "minItems": 0
        },
        "escapeReport": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "field": {
                "type": "string",
                "maxLength": 256
              },
              "method": {
                "type": "string",
                "maxLength": 80
              },
              "originalValue": {
                "type": "string",
                "maxLength": 32768
              },
              "escapedValue": {
                "type": "string",
                "maxLength": 32768
              }
            },
            "required": [
              "field",
              "method",
              "originalValue",
              "escapedValue"
            ],
            "additionalProperties": false
          },
          "maxItems": 1000,
          "minItems": 0
        }
      },
      "required": [
        "rendererId",
        "status",
        "originalResult",
        "drafts",
        "holds",
        "escapeReport"
      ],
      "additionalProperties": false
    }
  },
  "required": [
    "jobResult",
    "delivery"
  ],
  "additionalProperties": false
}

Related implementations

Compare implementations for this job · Primary business workflow

Caller workspaceId maps to data.workspace; name and notes carry the title and complete plain-text review. No html_notes, projects, assignees or provider actions are produced. Original result, including original reasons/holds, is preserved without mutation. Missing/extra destination fields or invalid metadata hold the draft. No truncation: overflow returns HELD with an empty drafts array and full original result.

Supplied input: vora-agency-change-order-impact · 1. Draft/result: asana-task-review · Asana REST API 1.0 tasks.

Mapping and loss rules

  • Caller workspaceId maps to data.workspace; name and notes carry the title and complete plain-text review.
  • No html_notes, projects, assignees or provider actions are produced.
  • Original result, including original reasons/holds, is preserved without mutation.
  • Missing/extra destination fields or invalid metadata hold the draft.
  • No truncation: overflow returns HELD with an empty drafts array and full original result.

This binding consumes supplied data. It does not establish an authenticated connector or a provider write.

Example input and result

These examples use synthetic data.

Input

{
  "jobInput": {
    "items": [
      {
        "id": "a",
        "removed": false,
        "minutes": 30,
        "ratePerHourMinor": 100,
        "estimated": true
      },
      {
        "id": "b",
        "removed": true,
        "minutes": 60,
        "ratePerHourMinor": 100,
        "estimated": true
      }
    ]
  },
  "deliveryMetadata": {
    "metadata": {
      "workflowId": "agency-change-order-impact",
      "canonicalIntentId": "client-delivery.change-order-impact",
      "title": "Change Order Impact",
      "reviewUrl": "https://example.test/workflows/change-order-impact/"
    },
    "destination": {
      "workspaceId": "1234567890"
    }
  }
}

Expected result

{
  "jobResult": {
    "netMinutes": -30,
    "netFeeMinor": -50,
    "unestimatedIds": []
  },
  "delivery": {
    "rendererId": "asana-task-review",
    "status": "PREPARED",
    "originalResult": {
      "netMinutes": -30,
      "netFeeMinor": -50,
      "unestimatedIds": []
    },
    "drafts": [
      {
        "body": {
          "data": {
            "workspace": "1234567890",
            "name": "Change Order Impact",
            "notes": "Change Order Impact\nWorkflow: agency-change-order-impact\nCanonical job: client-delivery.change-order-impact\nReview: https://example.test/workflows/change-order-impact/\n\n{\"netFeeMinor\":-50,\"netMinutes\":-30,\"unestimatedIds\":[]}"
          }
        }
      }
    ],
    "holds": [],
    "escapeReport": []
  }
}

Success means: Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order.

When something goes wrong

  • Review original business holds and target holds separately. Correct the relevant supplied input and rerun without discarding the original job result.

Limits and costs

  • This prepares a target-specific review draft from the original agency decision. The complete original job result and business holds remain visible. A held target produces no draft. No provider request, send, import, issue creation or publication occurs.
  • No paid model calls or metered third-party operations are declared in this pure graph. Vora plan availability, compute and quotas still apply; pricing has not been verified by this batch.

USE IN VORA

Change Order Impact — Asana task draft

Review this workflow’s steps and required inputs. Get access to Vora before setting it up in your workspace.

Workspace installation is being connected. This page lets you inspect the workflow; it does not create or run one.

Required input fields
{
  "type": "object",
  "properties": {
    "jobInput": {
      "type": "object",
      "properties": {
        "items": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "id": {
                "type": "string",
                "maxLength": 2000
              },
              "removed": {
                "type": "boolean"
              },
              "minutes": {
                "type": "integer",
                "minimum": -9007199254740991,
                "maximum": 9007199254740991
              },
              "ratePerHourMinor": {
                "type": "integer",
                "minimum": -9007199254740991,
                "maximum": 9007199254740991
              },
              "estimated": {
                "type": "boolean"
              }
            },
            "required": [
              "id",
              "removed",
              "minutes",
              "ratePerHourMinor",
              "estimated"
            ],
            "additionalProperties": false
          },
          "maxItems": 100
        }
      },
      "required": [
        "items"
      ],
      "additionalProperties": false
    },
    "deliveryMetadata": {
      "type": "object",
      "properties": {
        "metadata": {
          "type": "object",
          "properties": {
            "workflowId": {
              "type": "string",
              "maxLength": 128
            },
            "canonicalIntentId": {
              "type": "string",
              "maxLength": 200
            },
            "title": {
              "type": "string",
              "maxLength": 200
            },
            "reviewUrl": {
              "type": "string",
              "maxLength": 1000
            }
          },
          "required": [
            "workflowId",
            "canonicalIntentId",
            "title",
            "reviewUrl"
          ],
          "additionalProperties": false
        },
        "destination": {
          "type": "object",
          "properties": {
            "workspaceId": {
              "type": "string",
              "maxLength": 200
            }
          },
          "required": [
            "workspaceId"
          ],
          "additionalProperties": false
        }
      },
      "required": [
        "metadata",
        "destination"
      ],
      "additionalProperties": false
    }
  },
  "required": [
    "jobInput",
    "deliveryMetadata"
  ],
  "additionalProperties": false
}