Client Delivery
Change Order Impact — Escaped client review HTML
Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order. Prepare an Escaped client review HTML.
Workflow guide · revision 1
What you need
- Authorized supplied job facts matching the original closed input contract.
- Explicit review metadata and target destination fields; no implicit team, channel, list or project selection.
Inspect the workflow
Follow every step below. Branches are listed beside their originating step.
Supplied agency job and review metadata
Receive the explicitly supplied manual input packet.
- default: Change Order Impact
Change Order Impact
Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order.
- default: Escaped client review HTML
Escaped client review HTML
Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order.
Setup and review
- Review the supplied inputs, fictional examples and expected result. Recreate and configure the described workflow in your authorized Vora workspace when access is available.
- Review the jobInput and deliveryMetadata contracts shown below.
- Supply the original agency job input plus explicit review metadata and destination.
- Review the example jobResult, target status, holds and escape report before planning an external action.
Inspect the supplied-data operation
Review the supplied-data transformation and its settings. Native workflow previews are listed separately.
Supplied agency job and review metadata · wfManualTrigger
{
"label": "Supplied agency job and review metadata"
}Change Order Impact · code
{
"label": "Change Order Impact",
"code": "return (function(context){\nconst slug=\"change-order-impact\";\n\nfunction fail(reason){throw new Error('Invalid '+slug+' input: '+reason);}\nfunction safe(value){if(!Number.isSafeInteger(value))fail('unsafe integer arithmetic');return value;}\nfunction nonneg(value,name='quantity'){if(!Number.isSafeInteger(value)||value<0)fail(name+' must be nonnegative');return value;}\nfunction positive(value,name='quantity'){nonneg(value,name);if(value===0)fail(name+' must be positive');return value;}\nfunction ident(value){if(typeof value!=='string'||!value.trim())fail('blank identity');return value.trim();}\nfunction unique(values,key){const seen=new Set();for(const value of values){const k=ident(key?value[key]:value);if(seen.has(k))fail('duplicate identity');seen.add(k);}return values;}\nfunction rows(values,key='id'){return unique(values,key);}\nfunction sum(values){return values.reduce((total,value)=>safe(total+value),0);}\nfunction mul(a,b){return safe(a*b);}\nfunction sorted(values){return [...values].sort((a,b)=>a<b?-1:a>b?1:0);}\nfunction distinct(values){return [...new Set(values)];}\nfunction pair(a,b){return JSON.stringify([a,b]);}\nfunction day(value){if(typeof value!=='string'||!/^\\d{4}-\\d{2}-\\d{2}$/.test(value))fail('invalid calendar date');const n=Date.parse(value+'T00:00:00Z');if(!Number.isFinite(n)||new Date(n).toISOString().slice(0,10)!==value)fail('invalid calendar date');return n/86400000;}\nfunction dayText(value){const date=new Date(mul(value,86400000));if(!Number.isFinite(date.getTime())||date.getUTCFullYear()<0||date.getUTCFullYear()>9999)fail('four-digit calendar range');return date.toISOString().slice(0,10);}\nfunction stamp(value){const match=typeof value==='string'&&value.match(/^(\\d{4}-\\d{2}-\\d{2})T(\\d{2}):(\\d{2}):(\\d{2})(Z|[+-]\\d{2}:\\d{2})$/);if(!match)fail('invalid offset timestamp');day(match[1]);if(+match[2]>23||+match[3]>59||+match[4]>59)fail('invalid clock time');if(match[5]!=='Z'&&(+match[5].slice(1,3)>23||+match[5].slice(4)>59))fail('invalid offset');const n=Date.parse(value);if(!Number.isFinite(n))fail('invalid timestamp');return n/1000;}\nfunction stampText(value){const date=new Date(mul(value,1000));if(!Number.isFinite(date.getTime())||date.getUTCFullYear()<0||date.getUTCFullYear()>9999)fail('four-digit calendar range');return date.toISOString();}\nfunction interval(start,end){if(end<=start)fail('reversed or empty interval');}\nfunction normalize(value,key=''){if(typeof value==='string'&&(key==='id'||key.endsWith('Id')||key.endsWith('Ids')||['members','clients','partners','pageIds','expectedIds','jobs','requiredAttendees','requires','dependsOn'].includes(key)))return value.trim();if(Array.isArray(value))return value.map(v=>normalize(v,key));if(value&&typeof value==='object')return Object.fromEntries(Object.entries(value).map(([k,v])=>[k,normalize(v,k)]));return value;}\nfunction graphCheck(nodes,edges){const byId=new Map(rows(nodes).map(n=>[n.id,n]));const visiting=new Set(),done=new Set();function visit(id){if(visiting.has(id))fail('dependency cycle');if(done.has(id))return;const node=byId.get(id);if(!node)fail('unknown dependency reference');visiting.add(id);unique(edges(node));for(const target of edges(node)){if(target===id)fail('self prerequisite');visit(target);}visiting.delete(id);done.add(id);}for(const id of byId.keys())visit(id);return byId;}\nfunction monthNumber(date){day(date);return Number(date.slice(0,4))*12+Number(date.slice(5,7))-1;}\nfunction sweep(items,startKey,endKey,limit){const points=sorted(distinct(items.flatMap(item=>[item[startKey],item[endKey]]))).sort((a,b)=>a-b),out=[];for(let i=0;i+1<points.length;i++){const start=points[i],end=points[i+1],active=sorted(items.filter(item=>item[startKey]<=start&&item[endKey]>start).map(item=>item.id));if(active.length>limit){const last=out.at(-1);if(last&&last.end===start&&JSON.stringify(last.active)===JSON.stringify(active))last.end=end;else out.push({start,end,active});}}return out;}\nfunction httpUrl(value){if(typeof value!=='string'||/[\\u0000-\\u0020\\u007f<>\"\\\\]/.test(value)||/%(?![0-9a-f]{2})/i.test(value))return null;const m=value.match(/^https?:\\/\\/([^/?#]+)([^#]*)(?:#.*)?$/i);if(!m||m[1].includes('@'))return null;const authority=m[1].match(/^([^:]+)(?::(\\d{1,5}))?$/);if(!authority||(authority[2]&&Number(authority[2])>65535))return null;const host=authority[1],labels=host.split('.');if(host.length>253||labels.some(l=>!l||l.length>63||!/^[a-z0-9](?:[a-z0-9-]*[a-z0-9])?$/i.test(l)))return null;if(labels.every(l=>/^\\d+$/.test(l))&&(labels.length!==4||labels.some(l=>Number(l)>255||(l.length>1&&l[0]==='0'))))return null;const q=m[2].indexOf('?'),raw=q<0?'':m[2].slice(q+1),query=[];try{if(raw)for(const part of raw.split('&')){const at=part.indexOf('='),key=at<0?part:part.slice(0,at),val=at<0?'':part.slice(at+1);query.push([decodeURIComponent(key.replace(/\\+/g,' ')),decodeURIComponent(val.replace(/\\+/g,' '))]);}}catch{return null;}return {query};}\n\nconst input=normalize(context.input);\nreturn (input=>{\n rows(input.items);let netMinutes=0,netFeeMinor=0;const unestimatedIds=[];for(const item of input.items){nonneg(item.minutes,'effort');nonneg(item.ratePerHourMinor,'rate');if(!item.estimated){unestimatedIds.push(item.id);continue;}const fee=safe(Math.ceil(mul(item.minutes,item.ratePerHourMinor)/60)),sign=item.removed?-1:1;netMinutes=safe(netMinutes+sign*item.minutes);netFeeMinor=safe(netFeeMinor+sign*fee);}return {netMinutes,netFeeMinor,unestimatedIds};\n})(input);\n})({input:context.input.jobInput});\n",
"outputVar": "jobResult",
"timeout": 3000,
"memoryLimit": 64
}Escaped client review HTML · code
{
"label": "Escaped client review HTML",
"code": "const jobResult=context.jobResult;\nconst delivery=(function(context){\nreturn ((function(originalResult,metadata,destination){\nfunction stableResult(value,depth=0){\n if(depth>64)throw new Error('Result nesting exceeds 64');\n if(value===null||typeof value==='string'||typeof value==='boolean')return JSON.stringify(value);\n if(typeof value==='number'&&Number.isFinite(value))return JSON.stringify(value);\n if(Array.isArray(value)){\n if(Object.keys(value).length!==value.length||Array.from({length:value.length},(_,i)=>i).some(i=>!Object.hasOwn(value,i)))throw new Error('Result contains sparse data');\n return '['+value.map(item=>stableResult(item,depth+1)).join(',')+']';\n }\n if(value&&typeof value==='object')return '{'+Object.keys(value).sort().map(key=>JSON.stringify(key)+':'+stableResult(value[key],depth+1)).join(',')+'}';\n throw new Error('Result is not JSON data');\n}\nfunction utf8Length(text){\n let bytes=0;\n for(let i=0;i<text.length;i++){\n const code=text.charCodeAt(i);\n if(code<128)bytes++;else if(code<2048)bytes+=2;\n else if(code>=55296&&code<=56319&&i+1<text.length&&text.charCodeAt(i+1)>=56320&&text.charCodeAt(i+1)<=57343){bytes+=4;i++;}\n else bytes+=3;\n }\n return bytes;\n}\nfunction chunkText(text,maximum){\n const chunks=[];\n for(let start=0;start<text.length;){let end=Math.min(start+maximum,text.length);const last=text.charCodeAt(end-1),next=text.charCodeAt(end);if(end<text.length&&last>=55296&&last<=56319&&next>=56320&&next<=57343)end--;chunks.push(text.slice(start,end));start=end;}\n return chunks;\n}\nfunction deliveryState(rendererId,originalResult,metadata,destination,destinationKeys){\n const output={rendererId,status:'HELD',originalResult,drafts:[],holds:[],escapeReport:[]};\n const hold=(code,message)=>{output.holds.push({code,message});return {output,json:''};};\n const object=value=>value&&typeof value==='object'&&!Array.isArray(value);\n const exact=(value,keys)=>object(value)&&Object.keys(value).length===keys.length&&keys.every(key=>Object.hasOwn(value,key));\n const keys=['workflowId','canonicalIntentId','title','reviewUrl'],maxima=[128,200,200,1000];\n if(!exact(metadata,keys)||keys.some((key,i)=>typeof metadata[key]!=='string'||!metadata[key].length||metadata[key].length>maxima[i]||/[\\u0000-\\u001f\\u007f]/.test(metadata[key]))||!/^https?:\\/\\/[^\\s<>\"']+$/.test(metadata.reviewUrl))return hold('INVALID_METADATA','Metadata must provide bounded workflowId, canonicalIntentId, title and an HTTP(S) reviewUrl.');\n if(!exact(destination,destinationKeys)||destinationKeys.some(key=>typeof destination[key]!=='string'||!destination[key].length||destination[key].length>200||destination[key]!==destination[key].trim()||/[\\u0000-\\u001f\\u007f]/.test(destination[key])))return hold('INVALID_DESTINATION','Destination fields must be exactly: '+destinationKeys.join(', ')+'.');\n let json;\n try{if(!object(originalResult))throw new Error('Primary result must be a JSON object');json=stableResult(originalResult);}catch(error){return hold('INVALID_RESULT',error.message);}\n if(json.length>32768||utf8Length(json)>65536)return hold('RESULT_BOUND_EXCEEDED','Original result exceeds this renderer profile; full original result is retained.');\n return {output,json};\n}\nfunction escapeHtml(text){return text.replace(/&/g,'&').replace(/</g,'<').replace(/>/g,'>').replace(/\"/g,'"').replace(/'/g,''');}\nfunction escapeMarkdown(text){return text.replace(/&/g,'&').replace(/[\\\\`*{}\\[\\]()#+\\-.!_|>~<]/g,'\\\\$&');}\nfunction markdownReviewText(metadata,json){\n const runs=json.match(/`+/g)||[],fence='`'.repeat(Math.max(3,...runs.map(run=>run.length+1)));\n return '# '+escapeMarkdown(metadata.title)+'\\n\\nWorkflow: '+escapeMarkdown(metadata.workflowId)+'\\nCanonical job: '+escapeMarkdown(metadata.canonicalIntentId)+'\\nReview: <'+metadata.reviewUrl.replace(/&/g,'&')+'>\\n\\n'+fence+'json\\n'+json+'\\n'+fence+'\\n';\n}\nfunction plainReviewText(metadata,json){return metadata.title+'\\nWorkflow: '+metadata.workflowId+'\\nCanonical job: '+metadata.canonicalIntentId+'\\nReview: '+metadata.reviewUrl+'\\n\\n'+json;}\nfunction finishDraft(state,draft,texts=[],textMaximum=32768,byteMaximum=131072){\n if(texts.some(text=>text.length>textMaximum)||utf8Length(JSON.stringify(draft))>byteMaximum){state.output.holds.push({code:'TARGET_BOUND_EXCEEDED',message:'Draft exceeds the target or Vora profile bound; no draft is emitted and the full original result is retained.'});return state.output;}\n state.output.status='PREPARED';state.output.drafts=[draft];return state.output;\n}\nreturn (function clientHtml(originalResult,metadata,destination){\n const state=deliveryState('client-html',originalResult,metadata,destination,[]);if(state.output.holds.length)return state.output;\n const title=escapeHtml(metadata.title),text='<!doctype html><html lang=\"en\"><head><meta charset=\"utf-8\"><title>'+title+'</title></head><body><article><h1>'+title+'</h1><dl><dt>Workflow</dt><dd>'+escapeHtml(metadata.workflowId)+'</dd><dt>Canonical job</dt><dd>'+escapeHtml(metadata.canonicalIntentId)+'</dd></dl><p><a href=\"'+escapeHtml(metadata.reviewUrl)+'\">Review workflow</a></p><pre>'+escapeHtml(state.json)+'</pre></article></body></html>';\n return finishDraft(state,{mediaType:'text/html; charset=utf-8',text},[text]);\n})(originalResult,metadata,destination);\n}))(context.input.jobResult,context.input.deliveryMetadata.metadata,context.input.deliveryMetadata.destination);\n\n})({input:{jobResult,deliveryMetadata:context.input.deliveryMetadata}});\nreturn {jobResult,delivery};\n",
"outputVar": "result",
"timeout": 3000,
"memoryLimit": 64
}Input and output contracts
Input
{
"type": "object",
"properties": {
"jobInput": {
"type": "object",
"properties": {
"items": {
"type": "array",
"items": {
"type": "object",
"properties": {
"id": {
"type": "string",
"maxLength": 2000
},
"removed": {
"type": "boolean"
},
"minutes": {
"type": "integer",
"minimum": -9007199254740991,
"maximum": 9007199254740991
},
"ratePerHourMinor": {
"type": "integer",
"minimum": -9007199254740991,
"maximum": 9007199254740991
},
"estimated": {
"type": "boolean"
}
},
"required": [
"id",
"removed",
"minutes",
"ratePerHourMinor",
"estimated"
],
"additionalProperties": false
},
"maxItems": 100
}
},
"required": [
"items"
],
"additionalProperties": false
},
"deliveryMetadata": {
"type": "object",
"properties": {
"metadata": {
"type": "object",
"properties": {
"workflowId": {
"type": "string",
"maxLength": 128
},
"canonicalIntentId": {
"type": "string",
"maxLength": 200
},
"title": {
"type": "string",
"maxLength": 200
},
"reviewUrl": {
"type": "string",
"maxLength": 1000
}
},
"required": [
"workflowId",
"canonicalIntentId",
"title",
"reviewUrl"
],
"additionalProperties": false
},
"destination": {
"type": "object",
"properties": {},
"required": [],
"additionalProperties": false
}
},
"required": [
"metadata",
"destination"
],
"additionalProperties": false
}
},
"required": [
"jobInput",
"deliveryMetadata"
],
"additionalProperties": false
}Output
{
"type": "object",
"properties": {
"jobResult": {
"type": "object",
"properties": {
"netMinutes": {
"type": "integer",
"minimum": -9007199254740991,
"maximum": 9007199254740991
},
"netFeeMinor": {
"type": "integer",
"minimum": -9007199254740991,
"maximum": 9007199254740991
},
"unestimatedIds": {
"type": "array",
"items": {
"type": "string",
"maxLength": 2000
},
"maxItems": 1000
}
},
"required": [
"netMinutes",
"netFeeMinor",
"unestimatedIds"
],
"additionalProperties": false
},
"delivery": {
"type": "object",
"properties": {
"rendererId": {
"type": "string",
"maxLength": 128,
"enum": [
"client-html"
]
},
"status": {
"type": "string",
"maxLength": 16,
"enum": [
"PREPARED",
"HELD"
]
},
"originalResult": {
"type": "object",
"properties": {
"netMinutes": {
"type": "integer",
"minimum": -9007199254740991,
"maximum": 9007199254740991
},
"netFeeMinor": {
"type": "integer",
"minimum": -9007199254740991,
"maximum": 9007199254740991
},
"unestimatedIds": {
"type": "array",
"items": {
"type": "string",
"maxLength": 2000
},
"maxItems": 1000
}
},
"required": [
"netMinutes",
"netFeeMinor",
"unestimatedIds"
],
"additionalProperties": false
},
"drafts": {
"type": "array",
"items": {
"type": "object",
"properties": {
"mediaType": {
"type": "string",
"maxLength": 80,
"enum": [
"text/html; charset=utf-8"
]
},
"text": {
"type": "string",
"maxLength": 32768
}
},
"required": [
"mediaType",
"text"
],
"additionalProperties": false
},
"maxItems": 1,
"minItems": 0
},
"holds": {
"type": "array",
"items": {
"type": "object",
"properties": {
"code": {
"type": "string",
"maxLength": 128
},
"message": {
"type": "string",
"maxLength": 2000
}
},
"required": [
"code",
"message"
],
"additionalProperties": false
},
"maxItems": 10,
"minItems": 0
},
"escapeReport": {
"type": "array",
"items": {
"type": "object",
"properties": {
"field": {
"type": "string",
"maxLength": 256
},
"method": {
"type": "string",
"maxLength": 80
},
"originalValue": {
"type": "string",
"maxLength": 32768
},
"escapedValue": {
"type": "string",
"maxLength": 32768
}
},
"required": [
"field",
"method",
"originalValue",
"escapedValue"
],
"additionalProperties": false
},
"maxItems": 1000,
"minItems": 0
}
},
"required": [
"rendererId",
"status",
"originalResult",
"drafts",
"holds",
"escapeReport"
],
"additionalProperties": false
}
},
"required": [
"jobResult",
"delivery"
],
"additionalProperties": false
}Related implementations
Compare implementations for this job · Primary business workflow
Title, workflowId, canonicalIntentId, reviewUrl and full result JSON are escaped for HTML text/quoted attributes. The review URL must already pass the common bounded HTTP(S) metadata guard. The document contains no scripts or active provider actions. JSON is shown in pre; decoding HTML character references recovers its entire stable text. Original result, including original reasons/holds, is preserved without mutation. Missing/extra destination fields or invalid metadata hold the draft. No truncation: overflow returns HELD with an empty drafts array and full original result.
Supplied input: vora-agency-change-order-impact · 1. Draft/result: client-html · WHATWG HTML / Vora review document profile v1.
Mapping and loss rules
- Title, workflowId, canonicalIntentId, reviewUrl and full result JSON are escaped for HTML text/quoted attributes.
- The review URL must already pass the common bounded HTTP(S) metadata guard. The document contains no scripts or active provider actions.
- JSON is shown in pre; decoding HTML character references recovers its entire stable text.
- Original result, including original reasons/holds, is preserved without mutation.
- Missing/extra destination fields or invalid metadata hold the draft.
- No truncation: overflow returns HELD with an empty drafts array and full original result.
This binding consumes supplied data. It does not establish an authenticated connector or a provider write.
Example input and result
These examples use synthetic data.
Input
{
"jobInput": {
"items": [
{
"id": "a",
"removed": false,
"minutes": 30,
"ratePerHourMinor": 100,
"estimated": true
},
{
"id": "b",
"removed": true,
"minutes": 60,
"ratePerHourMinor": 100,
"estimated": true
}
]
},
"deliveryMetadata": {
"metadata": {
"workflowId": "agency-change-order-impact",
"canonicalIntentId": "client-delivery.change-order-impact",
"title": "Change Order Impact",
"reviewUrl": "https://example.test/workflows/change-order-impact/"
},
"destination": {}
}
}Expected result
{
"jobResult": {
"netMinutes": -30,
"netFeeMinor": -50,
"unestimatedIds": []
},
"delivery": {
"rendererId": "client-html",
"status": "PREPARED",
"originalResult": {
"netMinutes": -30,
"netFeeMinor": -50,
"unestimatedIds": []
},
"drafts": [
{
"mediaType": "text/html; charset=utf-8",
"text": "<!doctype html><html lang=\"en\"><head><meta charset=\"utf-8\"><title>Change Order Impact</title></head><body><article><h1>Change Order Impact</h1><dl><dt>Workflow</dt><dd>agency-change-order-impact</dd><dt>Canonical job</dt><dd>client-delivery.change-order-impact</dd></dl><p><a href=\"https://example.test/workflows/change-order-impact/\">Review workflow</a></p><pre>{"netFeeMinor":-50,"netMinutes":-30,"unestimatedIds":[]}</pre></article></body></html>"
}
],
"holds": [],
"escapeReport": []
}
}Success means: Produce a scope-delta effort and fee packet with unresolved estimate fields for commercial approval, without issuing a change order.
When something goes wrong
- Review original business holds and target holds separately. Correct the relevant supplied input and rerun without discarding the original job result.
Limits and costs
- This prepares a target-specific review draft from the original agency decision. The complete original job result and business holds remain visible. A held target produces no draft. No provider request, send, import, issue creation or publication occurs.
- No paid model calls or metered third-party operations are declared in this pure graph. Vora plan availability, compute and quotas still apply; pricing has not been verified by this batch.