Skip to workflow content
Vora
← Workflow library

Client Delivery

Review declared project critical paths and slack — Reviewer CSV file

Review the dependency path controlling a scoped automation implementation, and see which supplied tasks have slack. Prepare a Reviewer CSV file.

Experimental native example · local preview · revision 1

WORKFLOW PREVIEW

See how it works

3 nodes · 2 connections

Use + and − to zoom, F to fit. Press Enter on a node to inspect it.

Private preview. These tested drafts are available for inspection. Adding them to a Vora workspace is still being tested.

What you need

  • Authorized supplied job facts matching the original closed input contract.
  • Explicit review metadata and target destination fields; no implicit team, channel, list or project selection.
Follow the workflow step by step
  1. Supplied agency job and review metadata

    Receive the explicitly supplied manual input packet.

  2. Review declared project critical paths and slack

    Review the dependency path controlling a scoped automation implementation, and see which supplied tasks have slack.

  3. Reviewer CSV file

    Review the dependency path controlling a scoped automation implementation, and see which supplied tasks have slack.

Setup and review

  • Download the workflow JSON and inspect its jobInput and deliveryMetadata contracts.
  • Supply the original agency job input plus explicit review metadata and destination.
  • Run in an isolated test and inspect the complete jobResult, target status, holds and escape report before taking an external action.

Inspect every node

Expand a node to inspect its complete settings. Review the runtime and adoption evidence before installing it.

Supplied agency job and review metadata · wfManualTrigger
{
  "label": "Supplied agency job and review metadata"
}
Review declared project critical paths and slack · code
{
  "label": "Review declared project critical paths and slack",
  "code": "return (function(context){\n\nfunction fail(reason){throw new Error('input: '+reason);}\nfunction check(schema,value,where){\n if(value===null){if(schema.type==='null'||Array.isArray(schema.type)&&schema.type.includes('null'))return;fail(where+' wrong_type');}\n const type=Array.isArray(schema.type)?schema.type[0]:schema.type;\n if(type==='object'){\n  if(!value||typeof value!=='object'||Array.isArray(value))fail(where+' wrong_type');\n  for(const name of Object.keys(value))if(!Object.hasOwn(schema.properties,name))fail(where+' unknown_field');\n  for(const name of schema.required)if(!Object.hasOwn(value,name))fail(where+' missing_field');\n  for(const [name,shape]of Object.entries(schema.properties))check(shape,value[name],where+'.'+name);\n }else if(type==='array'){\n  if(!Array.isArray(value)||value.length>schema.maxItems)fail(where+' array_bound');\n  for(const item of value)check(schema.items,item,where+'[]');\n }else if(type==='string'){if(typeof value!=='string'||value.length>schema.maxLength)fail(where+' string_bound');}\n else if(type==='integer'){if(!Number.isSafeInteger(value)||value<schema.minimum||value>schema.maximum)fail(where+' integer_bound');}\n else if(type==='boolean'){if(typeof value!=='boolean')fail(where+' wrong_type');}\n else fail(where+' unsupported_type');\n}\nfunction id(value){if(typeof value!=='string'||!value||value.trim()!==value)fail('noncanonical_identity');return value;}\nfunction unique(values,reason){if(new Set(values).size!==values.length)fail(reason);}\nfunction safeAdd(a,b){if(a>Number.MAX_SAFE_INTEGER-b)fail('unsafe_sum');return a+b;}\nfunction day(value){if(!/^\\d{4}-\\d{2}-\\d{2}$/.test(value))fail('invalid_calendar_day');const ms=Date.parse(value+'T00:00:00Z');if(!Number.isFinite(ms)||new Date(ms).toISOString().slice(0,10)!==value)fail('invalid_calendar_day');return ms;}\nfunction refKey(ref){id(ref.assetId);if(ref.version<1)fail('positive_version_required');return JSON.stringify([ref.assetId,ref.version]);}\nfunction refValue(key){const pair=JSON.parse(key);return {assetId:pair[0],version:pair[1]};}\nfunction sortedRefs(keys){return [...keys].sort().map(refValue);}\n\nfunction lexIds(a,b){for(let i=0;i<Math.min(a.length,b.length);i++){if(a[i]<b[i])return -1;if(a[i]>b[i])return 1;}return a.length-b.length;}\nfunction maxSubset(rows,idField,feasible){let best=-1,ids=[],ties=0;for(let mask=0;mask<2**rows.length;mask++){const chosen=rows.filter((_,i)=>mask&(1<<i));if(!feasible(chosen))continue;const value=chosen.reduce((n,r)=>n+r.valuePoints,0),current=chosen.map(r=>r[idField]).sort();if(value>best){best=value;ids=current;ties=1;}else if(value===best){ties++;if(lexIds(current,ids)<0)ids=current;}}return {ids,value:best,ties};}\nfunction rat(n,d){if(d===0n)fail('zero_denominator');if(d<0n){n=-n;d=-d;}let a=n<0n?-n:n,b=d;while(b){const next=a%b;a=b;b=next;}return [n/a,d/a];}\nfunction ratAdd(a,b){return rat(a[0]*b[1]+b[0]*a[1],a[1]*b[1]);}\nfunction ratSub(a,b){return rat(a[0]*b[1]-b[0]*a[1],a[1]*b[1]);}\nfunction ratMul(a,b){return rat(a[0]*b[0],a[1]*b[1]);}\nfunction ratText(a){return a[0].toString()+'/'+a[1].toString();}\n\n\ncheck({\"type\":\"object\",\"properties\":{\"scopeId\":{\"type\":\"string\",\"maxLength\":128},\"selectionComplete\":{\"type\":[\"boolean\",\"null\"]},\"tasks\":{\"type\":\"array\",\"items\":{\"type\":\"object\",\"properties\":{\"taskId\":{\"type\":\"string\",\"maxLength\":128},\"durationUnits\":{\"type\":[\"integer\",\"null\"],\"minimum\":1,\"maximum\":100000},\"dependsOn\":{\"type\":\"array\",\"items\":{\"type\":\"string\",\"maxLength\":128},\"maxItems\":10}},\"required\":[\"taskId\",\"durationUnits\",\"dependsOn\"],\"additionalProperties\":false},\"maxItems\":30}},\"required\":[\"scopeId\",\"selectionComplete\",\"tasks\"],\"additionalProperties\":false},context.input,\"input\");\nconst result=(function criticalPath(x){\n id(x.scopeId);unique(x.tasks.map(t=>id(t.taskId)),'duplicate_task_id');const tasks=new Map(x.tasks.map(t=>[t.taskId,t])),degree=new Map(),children=new Map(x.tasks.map(t=>[t.taskId,[]])),missing=new Set(),unknown=x.tasks.filter(t=>t.durationUnits===null).map(t=>t.taskId).sort();\n for(const t of x.tasks){unique(t.dependsOn.map(id),'duplicate_dependency');degree.set(t.taskId,t.dependsOn.length);for(const d of t.dependsOn){if(!tasks.has(d))missing.add(d);else children.get(d).push(t.taskId);}}\n const queue=x.tasks.filter(t=>degree.get(t.taskId)===0).map(t=>t.taskId).sort(),order=[];\n while(queue.length){const next=queue.shift();order.push(next);for(const child of children.get(next)){degree.set(child,degree.get(child)-1);if(degree.get(child)===0){queue.push(child);queue.sort();}}}\n const unresolved=x.tasks.filter(t=>!order.includes(t.taskId)).map(t=>t.taskId).sort(),base={projectDurationUnits:null,rows:[],criticalTaskIds:[],missingDependencyIds:[...missing].sort(),unresolvedTaskIds:unresolved,unknownDurationTaskIds:unknown};\n if(missing.size)return {status:'incomplete_dependencies',...base};if(unresolved.length)return {status:'cyclic_or_blocked_dependencies',...base};if(x.selectionComplete!==true||unknown.length)return {status:'unknown',...base};\n const earliest=new Map(),finish=new Map(),latest=new Map();let total=0;\n for(const name of order){const t=tasks.get(name),start=t.dependsOn.length?Math.max(...t.dependsOn.map(d=>finish.get(d))):0;earliest.set(name,start);finish.set(name,start+t.durationUnits);total=Math.max(total,finish.get(name));}\n for(const name of [...order].reverse()){const t=tasks.get(name),cs=children.get(name),end=cs.length?Math.min(...cs.map(c=>latest.get(c))):total;latest.set(name,end-t.durationUnits);}\n const rows=[...tasks.keys()].sort().map(taskId=>({taskId,earliestStartUnits:earliest.get(taskId),latestStartUnits:latest.get(taskId),slackUnits:latest.get(taskId)-earliest.get(taskId)}));\n return {status:'schedule_within_supplied_tasks',...base,projectDurationUnits:total,rows,criticalTaskIds:rows.filter(r=>r.slackUnits===0).map(r=>r.taskId)};\n})(context.input);\ncheck({\"type\":\"object\",\"properties\":{\"status\":{\"type\":\"string\",\"maxLength\":128},\"projectDurationUnits\":{\"type\":[\"integer\",\"null\"],\"minimum\":0,\"maximum\":3000000},\"rows\":{\"type\":\"array\",\"items\":{\"type\":\"object\",\"properties\":{\"taskId\":{\"type\":\"string\",\"maxLength\":128},\"earliestStartUnits\":{\"type\":\"integer\",\"minimum\":0,\"maximum\":3000000},\"latestStartUnits\":{\"type\":\"integer\",\"minimum\":0,\"maximum\":3000000},\"slackUnits\":{\"type\":\"integer\",\"minimum\":0,\"maximum\":3000000}},\"required\":[\"taskId\",\"earliestStartUnits\",\"latestStartUnits\",\"slackUnits\"],\"additionalProperties\":false},\"maxItems\":30},\"criticalTaskIds\":{\"type\":\"array\",\"items\":{\"type\":\"string\",\"maxLength\":128},\"maxItems\":100},\"missingDependencyIds\":{\"type\":\"array\",\"items\":{\"type\":\"string\",\"maxLength\":128},\"maxItems\":100},\"unresolvedTaskIds\":{\"type\":\"array\",\"items\":{\"type\":\"string\",\"maxLength\":128},\"maxItems\":100},\"unknownDurationTaskIds\":{\"type\":\"array\",\"items\":{\"type\":\"string\",\"maxLength\":128},\"maxItems\":100}},\"required\":[\"status\",\"projectDurationUnits\",\"rows\",\"criticalTaskIds\",\"missingDependencyIds\",\"unresolvedTaskIds\",\"unknownDurationTaskIds\"],\"additionalProperties\":false},result,\"output\");\nreturn result;\n})({input:context.input.jobInput});\n",
  "outputVar": "jobResult",
  "timeout": 3000,
  "memoryLimit": 64
}
Reviewer CSV file · code
{
  "label": "Reviewer CSV file",
  "code": "const jobResult=context.jobResult;\nconst delivery=(function(context){\nreturn ((function(originalResult,metadata,destination){\nfunction stableResult(value,depth=0){\n  if(depth>64)throw new Error('Result nesting exceeds 64');\n  if(value===null||typeof value==='string'||typeof value==='boolean')return JSON.stringify(value);\n  if(typeof value==='number'&&Number.isFinite(value))return JSON.stringify(value);\n  if(Array.isArray(value)){\n    if(Object.keys(value).length!==value.length||Array.from({length:value.length},(_,i)=>i).some(i=>!Object.hasOwn(value,i)))throw new Error('Result contains sparse data');\n    return '['+value.map(item=>stableResult(item,depth+1)).join(',')+']';\n  }\n  if(value&&typeof value==='object')return '{'+Object.keys(value).sort().map(key=>JSON.stringify(key)+':'+stableResult(value[key],depth+1)).join(',')+'}';\n  throw new Error('Result is not JSON data');\n}\nfunction utf8Length(text){\n  let bytes=0;\n  for(let i=0;i<text.length;i++){\n    const code=text.charCodeAt(i);\n    if(code<128)bytes++;else if(code<2048)bytes+=2;\n    else if(code>=55296&&code<=56319&&i+1<text.length&&text.charCodeAt(i+1)>=56320&&text.charCodeAt(i+1)<=57343){bytes+=4;i++;}\n    else bytes+=3;\n  }\n  return bytes;\n}\nfunction chunkText(text,maximum){\n  const chunks=[];\n  for(let start=0;start<text.length;){let end=Math.min(start+maximum,text.length);const last=text.charCodeAt(end-1),next=text.charCodeAt(end);if(end<text.length&&last>=55296&&last<=56319&&next>=56320&&next<=57343)end--;chunks.push(text.slice(start,end));start=end;}\n  return chunks;\n}\nfunction deliveryState(rendererId,originalResult,metadata,destination,destinationKeys){\n  const output={rendererId,status:'HELD',originalResult,drafts:[],holds:[],escapeReport:[]};\n  const hold=(code,message)=>{output.holds.push({code,message});return {output,json:''};};\n  const object=value=>value&&typeof value==='object'&&!Array.isArray(value);\n  const exact=(value,keys)=>object(value)&&Object.keys(value).length===keys.length&&keys.every(key=>Object.hasOwn(value,key));\n  const keys=['workflowId','canonicalIntentId','title','reviewUrl'],maxima=[128,200,200,1000];\n  if(!exact(metadata,keys)||keys.some((key,i)=>typeof metadata[key]!=='string'||!metadata[key].length||metadata[key].length>maxima[i]||/[\\u0000-\\u001f\\u007f]/.test(metadata[key]))||!/^https?:\\/\\/[^\\s<>\"']+$/.test(metadata.reviewUrl))return hold('INVALID_METADATA','Metadata must provide bounded workflowId, canonicalIntentId, title and an HTTP(S) reviewUrl.');\n  if(!exact(destination,destinationKeys)||destinationKeys.some(key=>typeof destination[key]!=='string'||!destination[key].length||destination[key].length>200||destination[key]!==destination[key].trim()||/[\\u0000-\\u001f\\u007f]/.test(destination[key])))return hold('INVALID_DESTINATION','Destination fields must be exactly: '+destinationKeys.join(', ')+'.');\n  let json;\n  try{if(!object(originalResult))throw new Error('Primary result must be a JSON object');json=stableResult(originalResult);}catch(error){return hold('INVALID_RESULT',error.message);}\n  if(json.length>32768||utf8Length(json)>65536)return hold('RESULT_BOUND_EXCEEDED','Original result exceeds this renderer profile; full original result is retained.');\n  return {output,json};\n}\nfunction escapeHtml(text){return text.replace(/&/g,'&amp;').replace(/</g,'&lt;').replace(/>/g,'&gt;').replace(/\"/g,'&quot;').replace(/'/g,'&#39;');}\nfunction escapeMarkdown(text){return text.replace(/&/g,'&amp;').replace(/[\\\\`*{}\\[\\]()#+\\-.!_|>~<]/g,'\\\\$&');}\nfunction markdownReviewText(metadata,json){\n  const runs=json.match(/`+/g)||[],fence='`'.repeat(Math.max(3,...runs.map(run=>run.length+1)));\n  return '# '+escapeMarkdown(metadata.title)+'\\n\\nWorkflow: '+escapeMarkdown(metadata.workflowId)+'\\nCanonical job: '+escapeMarkdown(metadata.canonicalIntentId)+'\\nReview: <'+metadata.reviewUrl.replace(/&/g,'&amp;')+'>\\n\\n'+fence+'json\\n'+json+'\\n'+fence+'\\n';\n}\nfunction plainReviewText(metadata,json){return metadata.title+'\\nWorkflow: '+metadata.workflowId+'\\nCanonical job: '+metadata.canonicalIntentId+'\\nReview: '+metadata.reviewUrl+'\\n\\n'+json;}\nfunction finishDraft(state,draft,texts=[],textMaximum=32768,byteMaximum=131072){\n  if(texts.some(text=>text.length>textMaximum)||utf8Length(JSON.stringify(draft))>byteMaximum){state.output.holds.push({code:'TARGET_BOUND_EXCEEDED',message:'Draft exceeds the target or Vora profile bound; no draft is emitted and the full original result is retained.'});return state.output;}\n  state.output.status='PREPARED';state.output.drafts=[draft];return state.output;\n}\nreturn (function reviewerCsv(originalResult,metadata,destination){\n  const state=deliveryState('reviewer-csv',originalResult,metadata,destination,[]);if(state.output.holds.length)return state.output;\n  const fields=['workflowId','canonicalIntentId','title','reviewUrl','resultJson'];\n  const values=[metadata.workflowId,metadata.canonicalIntentId,metadata.title,metadata.reviewUrl,state.json].map((value,index)=>{\n    if(/^\\s*[=+\\-@]/.test(value)){const escapedValue=\"'\"+value;state.output.escapeReport.push({field:fields[index],method:'prefix-apostrophe-v1',originalValue:value,escapedValue});return escapedValue;}return value;\n  });\n  const quote=value=>'\"'+value.replace(/\"/g,'\"\"')+'\"';\n  const text=fields.map(quote).join(',')+'\\r\\n'+values.map(quote).join(',')+'\\r\\n';\n  return finishDraft(state,{mediaType:'text/csv; charset=utf-8',text},[text]);\n})(originalResult,metadata,destination);\n}))(context.input.jobResult,context.input.deliveryMetadata.metadata,context.input.deliveryMetadata.destination);\n\n})({input:{jobResult,deliveryMetadata:context.input.deliveryMetadata}});\nreturn {jobResult,delivery};\n",
  "outputVar": "result",
  "timeout": 3000,
  "memoryLimit": 64
}
Input and output contracts

Input

{
  "type": "object",
  "properties": {
    "jobInput": {
      "type": "object",
      "properties": {
        "scopeId": {
          "type": "string",
          "maxLength": 128
        },
        "selectionComplete": {
          "type": [
            "boolean",
            "null"
          ]
        },
        "tasks": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "taskId": {
                "type": "string",
                "maxLength": 128
              },
              "durationUnits": {
                "type": [
                  "integer",
                  "null"
                ],
                "minimum": 1,
                "maximum": 100000
              },
              "dependsOn": {
                "type": "array",
                "items": {
                  "type": "string",
                  "maxLength": 128
                },
                "maxItems": 10
              }
            },
            "required": [
              "taskId",
              "durationUnits",
              "dependsOn"
            ],
            "additionalProperties": false
          },
          "maxItems": 30
        }
      },
      "required": [
        "scopeId",
        "selectionComplete",
        "tasks"
      ],
      "additionalProperties": false
    },
    "deliveryMetadata": {
      "type": "object",
      "properties": {
        "metadata": {
          "type": "object",
          "properties": {
            "workflowId": {
              "type": "string",
              "maxLength": 128
            },
            "canonicalIntentId": {
              "type": "string",
              "maxLength": 200
            },
            "title": {
              "type": "string",
              "maxLength": 200
            },
            "reviewUrl": {
              "type": "string",
              "maxLength": 1000
            }
          },
          "required": [
            "workflowId",
            "canonicalIntentId",
            "title",
            "reviewUrl"
          ],
          "additionalProperties": false
        },
        "destination": {
          "type": "object",
          "properties": {},
          "required": [],
          "additionalProperties": false
        }
      },
      "required": [
        "metadata",
        "destination"
      ],
      "additionalProperties": false
    }
  },
  "required": [
    "jobInput",
    "deliveryMetadata"
  ],
  "additionalProperties": false
}

Output

{
  "type": "object",
  "properties": {
    "jobResult": {
      "type": "object",
      "properties": {
        "status": {
          "type": "string",
          "maxLength": 128
        },
        "projectDurationUnits": {
          "type": [
            "integer",
            "null"
          ],
          "minimum": 0,
          "maximum": 3000000
        },
        "rows": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "taskId": {
                "type": "string",
                "maxLength": 128
              },
              "earliestStartUnits": {
                "type": "integer",
                "minimum": 0,
                "maximum": 3000000
              },
              "latestStartUnits": {
                "type": "integer",
                "minimum": 0,
                "maximum": 3000000
              },
              "slackUnits": {
                "type": "integer",
                "minimum": 0,
                "maximum": 3000000
              }
            },
            "required": [
              "taskId",
              "earliestStartUnits",
              "latestStartUnits",
              "slackUnits"
            ],
            "additionalProperties": false
          },
          "maxItems": 30
        },
        "criticalTaskIds": {
          "type": "array",
          "items": {
            "type": "string",
            "maxLength": 128
          },
          "maxItems": 100
        },
        "missingDependencyIds": {
          "type": "array",
          "items": {
            "type": "string",
            "maxLength": 128
          },
          "maxItems": 100
        },
        "unresolvedTaskIds": {
          "type": "array",
          "items": {
            "type": "string",
            "maxLength": 128
          },
          "maxItems": 100
        },
        "unknownDurationTaskIds": {
          "type": "array",
          "items": {
            "type": "string",
            "maxLength": 128
          },
          "maxItems": 100
        }
      },
      "required": [
        "status",
        "projectDurationUnits",
        "rows",
        "criticalTaskIds",
        "missingDependencyIds",
        "unresolvedTaskIds",
        "unknownDurationTaskIds"
      ],
      "additionalProperties": false
    },
    "delivery": {
      "type": "object",
      "properties": {
        "rendererId": {
          "type": "string",
          "maxLength": 128,
          "enum": [
            "reviewer-csv"
          ]
        },
        "status": {
          "type": "string",
          "maxLength": 16,
          "enum": [
            "PREPARED",
            "HELD"
          ]
        },
        "originalResult": {
          "type": "object",
          "properties": {
            "status": {
              "type": "string",
              "maxLength": 128
            },
            "projectDurationUnits": {
              "type": [
                "integer",
                "null"
              ],
              "minimum": 0,
              "maximum": 3000000
            },
            "rows": {
              "type": "array",
              "items": {
                "type": "object",
                "properties": {
                  "taskId": {
                    "type": "string",
                    "maxLength": 128
                  },
                  "earliestStartUnits": {
                    "type": "integer",
                    "minimum": 0,
                    "maximum": 3000000
                  },
                  "latestStartUnits": {
                    "type": "integer",
                    "minimum": 0,
                    "maximum": 3000000
                  },
                  "slackUnits": {
                    "type": "integer",
                    "minimum": 0,
                    "maximum": 3000000
                  }
                },
                "required": [
                  "taskId",
                  "earliestStartUnits",
                  "latestStartUnits",
                  "slackUnits"
                ],
                "additionalProperties": false
              },
              "maxItems": 30
            },
            "criticalTaskIds": {
              "type": "array",
              "items": {
                "type": "string",
                "maxLength": 128
              },
              "maxItems": 100
            },
            "missingDependencyIds": {
              "type": "array",
              "items": {
                "type": "string",
                "maxLength": 128
              },
              "maxItems": 100
            },
            "unresolvedTaskIds": {
              "type": "array",
              "items": {
                "type": "string",
                "maxLength": 128
              },
              "maxItems": 100
            },
            "unknownDurationTaskIds": {
              "type": "array",
              "items": {
                "type": "string",
                "maxLength": 128
              },
              "maxItems": 100
            }
          },
          "required": [
            "status",
            "projectDurationUnits",
            "rows",
            "criticalTaskIds",
            "missingDependencyIds",
            "unresolvedTaskIds",
            "unknownDurationTaskIds"
          ],
          "additionalProperties": false
        },
        "drafts": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "mediaType": {
                "type": "string",
                "maxLength": 80,
                "enum": [
                  "text/csv; charset=utf-8"
                ]
              },
              "text": {
                "type": "string",
                "maxLength": 32768
              }
            },
            "required": [
              "mediaType",
              "text"
            ],
            "additionalProperties": false
          },
          "maxItems": 1,
          "minItems": 0
        },
        "holds": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "code": {
                "type": "string",
                "maxLength": 128
              },
              "message": {
                "type": "string",
                "maxLength": 2000
              }
            },
            "required": [
              "code",
              "message"
            ],
            "additionalProperties": false
          },
          "maxItems": 10,
          "minItems": 0
        },
        "escapeReport": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "field": {
                "type": "string",
                "maxLength": 256
              },
              "method": {
                "type": "string",
                "maxLength": 80
              },
              "originalValue": {
                "type": "string",
                "maxLength": 32768
              },
              "escapedValue": {
                "type": "string",
                "maxLength": 32768
              }
            },
            "required": [
              "field",
              "method",
              "originalValue",
              "escapedValue"
            ],
            "additionalProperties": false
          },
          "maxItems": 1000,
          "minItems": 0
        }
      },
      "required": [
        "rendererId",
        "status",
        "originalResult",
        "drafts",
        "holds",
        "escapeReport"
      ],
      "additionalProperties": false
    }
  },
  "required": [
    "jobResult",
    "delivery"
  ],
  "additionalProperties": false
}

Related implementations

Compare implementations for this job · Primary business workflow

All five fields are quoted, embedded double quotes are doubled, records end in CRLF. Formula-like cells beginning with optional whitespace then = + - @ receive one leading apostrophe. escapeReport records field, originalValue and escapedValue; remove that one recorded prefix to recover the exact original. The complete stable result JSON occupies resultJson; no spreadsheet import or formula execution is performed. Original result, including original reasons/holds, is preserved without mutation. Missing/extra destination fields or invalid metadata hold the draft. No truncation: overflow returns HELD with an empty drafts array and full original result.

Supplied input: vora-agency-project-critical-path-review · 1. Draft/result: reviewer-csv · RFC 4180 / Vora reversible formula-escape profile v1.

Mapping and loss rules

  • All five fields are quoted, embedded double quotes are doubled, records end in CRLF.
  • Formula-like cells beginning with optional whitespace then = + - @ receive one leading apostrophe. escapeReport records field, originalValue and escapedValue; remove that one recorded prefix to recover the exact original.
  • The complete stable result JSON occupies resultJson; no spreadsheet import or formula execution is performed.
  • Original result, including original reasons/holds, is preserved without mutation.
  • Missing/extra destination fields or invalid metadata hold the draft.
  • No truncation: overflow returns HELD with an empty drafts array and full original result.

This binding consumes supplied data. It does not establish an authenticated connector or a provider write.

Example input and result

These examples use synthetic data.

Input

{
  "jobInput": {
    "scopeId": "client-A",
    "selectionComplete": true,
    "tasks": [
      {
        "taskId": "a",
        "durationUnits": 2,
        "dependsOn": []
      },
      {
        "taskId": "b",
        "durationUnits": 3,
        "dependsOn": [
          "a"
        ]
      },
      {
        "taskId": "c",
        "durationUnits": 4,
        "dependsOn": [
          "a"
        ]
      },
      {
        "taskId": "d",
        "durationUnits": 1,
        "dependsOn": [
          "b",
          "c"
        ]
      }
    ]
  },
  "deliveryMetadata": {
    "metadata": {
      "workflowId": "agency-project-critical-path-review",
      "canonicalIntentId": "planning.review-project-critical-path-slack",
      "title": "Review declared project critical paths and slack",
      "reviewUrl": "https://example.test/workflows/project-critical-path-review/"
    },
    "destination": {}
  }
}

Expected result

{
  "jobResult": {
    "status": "schedule_within_supplied_tasks",
    "projectDurationUnits": 7,
    "rows": [
      {
        "taskId": "a",
        "earliestStartUnits": 0,
        "latestStartUnits": 0,
        "slackUnits": 0
      },
      {
        "taskId": "b",
        "earliestStartUnits": 2,
        "latestStartUnits": 3,
        "slackUnits": 1
      },
      {
        "taskId": "c",
        "earliestStartUnits": 2,
        "latestStartUnits": 2,
        "slackUnits": 0
      },
      {
        "taskId": "d",
        "earliestStartUnits": 6,
        "latestStartUnits": 6,
        "slackUnits": 0
      }
    ],
    "criticalTaskIds": [
      "a",
      "c",
      "d"
    ],
    "missingDependencyIds": [],
    "unresolvedTaskIds": [],
    "unknownDurationTaskIds": []
  },
  "delivery": {
    "rendererId": "reviewer-csv",
    "status": "PREPARED",
    "originalResult": {
      "status": "schedule_within_supplied_tasks",
      "projectDurationUnits": 7,
      "rows": [
        {
          "taskId": "a",
          "earliestStartUnits": 0,
          "latestStartUnits": 0,
          "slackUnits": 0
        },
        {
          "taskId": "b",
          "earliestStartUnits": 2,
          "latestStartUnits": 3,
          "slackUnits": 1
        },
        {
          "taskId": "c",
          "earliestStartUnits": 2,
          "latestStartUnits": 2,
          "slackUnits": 0
        },
        {
          "taskId": "d",
          "earliestStartUnits": 6,
          "latestStartUnits": 6,
          "slackUnits": 0
        }
      ],
      "criticalTaskIds": [
        "a",
        "c",
        "d"
      ],
      "missingDependencyIds": [],
      "unresolvedTaskIds": [],
      "unknownDurationTaskIds": []
    },
    "drafts": [
      {
        "mediaType": "text/csv; charset=utf-8",
        "text": "\"workflowId\",\"canonicalIntentId\",\"title\",\"reviewUrl\",\"resultJson\"\r\n\"agency-project-critical-path-review\",\"planning.review-project-critical-path-slack\",\"Review declared project critical paths and slack\",\"https://example.test/workflows/project-critical-path-review/\",\"{\"\"criticalTaskIds\"\":[\"\"a\"\",\"\"c\"\",\"\"d\"\"],\"\"missingDependencyIds\"\":[],\"\"projectDurationUnits\"\":7,\"\"rows\"\":[{\"\"earliestStartUnits\"\":0,\"\"latestStartUnits\"\":0,\"\"slackUnits\"\":0,\"\"taskId\"\":\"\"a\"\"},{\"\"earliestStartUnits\"\":2,\"\"latestStartUnits\"\":3,\"\"slackUnits\"\":1,\"\"taskId\"\":\"\"b\"\"},{\"\"earliestStartUnits\"\":2,\"\"latestStartUnits\"\":2,\"\"slackUnits\"\":0,\"\"taskId\"\":\"\"c\"\"},{\"\"earliestStartUnits\"\":6,\"\"latestStartUnits\"\":6,\"\"slackUnits\"\":0,\"\"taskId\"\":\"\"d\"\"}],\"\"status\"\":\"\"schedule_within_supplied_tasks\"\",\"\"unknownDurationTaskIds\"\":[],\"\"unresolvedTaskIds\"\":[]}\"\r\n"
      }
    ],
    "holds": [],
    "escapeReport": []
  }
}

Success means: Review the dependency path controlling a scoped automation implementation, and see which supplied tasks have slack.

When something goes wrong

  • Review original business holds and target holds separately. Correct the relevant supplied input and rerun without discarding the original job result.

Limits and costs

  • This prepares a target-specific review draft from the original agency decision. The complete original job result and business holds remain visible. A held target produces no draft. No provider request, send, import, issue creation or publication occurs.
  • No paid model calls or metered third-party operations are declared in this pure graph. Vora plan availability, compute and quotas still apply; pricing has not been verified by this batch.

USE IN VORA

Review declared project critical paths and slack — Reviewer CSV file

Review this workflow’s steps and required inputs. Get access to Vora before setting it up in your workspace.

Workspace installation is being connected. This page lets you inspect the workflow; it does not create or run one.

Required input fields
{
  "type": "object",
  "properties": {
    "jobInput": {
      "type": "object",
      "properties": {
        "scopeId": {
          "type": "string",
          "maxLength": 128
        },
        "selectionComplete": {
          "type": [
            "boolean",
            "null"
          ]
        },
        "tasks": {
          "type": "array",
          "items": {
            "type": "object",
            "properties": {
              "taskId": {
                "type": "string",
                "maxLength": 128
              },
              "durationUnits": {
                "type": [
                  "integer",
                  "null"
                ],
                "minimum": 1,
                "maximum": 100000
              },
              "dependsOn": {
                "type": "array",
                "items": {
                  "type": "string",
                  "maxLength": 128
                },
                "maxItems": 10
              }
            },
            "required": [
              "taskId",
              "durationUnits",
              "dependsOn"
            ],
            "additionalProperties": false
          },
          "maxItems": 30
        }
      },
      "required": [
        "scopeId",
        "selectionComplete",
        "tasks"
      ],
      "additionalProperties": false
    },
    "deliveryMetadata": {
      "type": "object",
      "properties": {
        "metadata": {
          "type": "object",
          "properties": {
            "workflowId": {
              "type": "string",
              "maxLength": 128
            },
            "canonicalIntentId": {
              "type": "string",
              "maxLength": 200
            },
            "title": {
              "type": "string",
              "maxLength": 200
            },
            "reviewUrl": {
              "type": "string",
              "maxLength": 1000
            }
          },
          "required": [
            "workflowId",
            "canonicalIntentId",
            "title",
            "reviewUrl"
          ],
          "additionalProperties": false
        },
        "destination": {
          "type": "object",
          "properties": {},
          "required": [],
          "additionalProperties": false
        }
      },
      "required": [
        "metadata",
        "destination"
      ],
      "additionalProperties": false
    }
  },
  "required": [
    "jobInput",
    "deliveryMetadata"
  ],
  "additionalProperties": false
}